Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Polywell |
Model Number : | PW-S80 |
Certification : | SGS |
Price : | $15,000- 18,000 / Set |
Payment Terms : | T/T |
Supply Ability : | 30 Sets per Month |
Delivery Time : | 28-35 work days |
Automatic Plastic Tape Extruder Thermal Isolation Bar Extrusion Machine for Aluminum Profile
Why use polyamide strip as thermal barrier function?
1. Because polyamide strip including Polyamide and glass fiber, its
strength can reach requirement for aluminium profile window, door,
curtain and walls.
2. Conductivity of polyamide strip is very low, prohibit hot air or
cold air transferred from outside to inside, energy saving product.
Automatic PA profiles extruding machine is for the production of polyamide thermal break profiles, which used in aluminum windows and doors.
Many customer use thermal break aluminum profile to do windows and doors to keep the heat from being affected by cold air, then make use of energy saving.
We provide high quality PA profiles extruding machine along with various molds and raw material-PA66GF25 granules, and also the subsequent technical assistance. This machine includes raw material auto feeding machine, hopper dryer, main engine, frequency converter and gearbox.
Machine Parameter
Material | PA66GF25 |
Production Speed | 8-14 cm/min |
Max Output | 60-80 kg/h |
Power | 380V,50Hz or customized |
Water | Tap water or well water |
Application
1. Used for thermal break aluminum window, door, curtain and walls
2. Many customer use thermal break aluminum profile to do big air
conditioner to keep heat of cold air, then make use of energy
saving
Our Advantage
-We can make good quality strips moulds, including the complicated
moulds.
Strip quantity from 20-120 pcs.
Strip shape from I type, C type, T type, CT type Hollow type etc.
-We can supply the whole production line, including raw material,
Parallel twin-screw granulator and the extruding machine of thermal
barrier strip.
Our Service
Before
1. introduce products in detail
2. recommend suitable solutions
3. provide with reference information
During manufacturing
1. provide with layout and engineering conditions
2. inform the processing status
3. offer related documents
After Sales
1. provide installation, commissioning and training
2. offer spare parts
3. Provide with necessary technical support
Production Time
28-38 working days after receiving the deposit
Payment
50% T/T before production, 50%T/T before shipment
Our Factory
Please feel free to contact us if you have any questions.
![]() |